Permit and construction drawings for a new fire station, coordinated with structural and MEP consultants and delivered on the client’s CAD standards.

  • Client: general contractor
  • Sector: civic
  • Delivered: permit + construction set
  • Duration: 6 weeks
Student union hostel captured for Scan to BIM
Permit setPlus construction drawings
CAD · sheetsCoordinated with consultants
About the project

A civic building on a fixed budget

A design-build contractor was delivering a new fire station with apparatus bays, crew quarters and training areas. The permit submission and construction set had to be produced quickly to hold the start date.

We drafted the architectural set and coordinated it with the structural and MEP consultants’ drawings.

What we delivered

  • Permit drawing set
  • Floor plans and elevations
  • Building sections
  • Apparatus bay details
  • Door and finish schedules
  • Coordinated MEP backgrounds
  • Start date fixed

    Permit drawings had to be submitted within four weeks.

  • Three consultants

    Architecture, structure and services had to agree on every sheet.

  • Authority comments

    Review comments needed fast, clean resubmission.

Have a building to capture? Send your point cloud and scope. We reply with an approach and quote within one working day.

Our process

From source files to drawing set in six steps

How the drawings were produced, checked and issued.

  1. 01

    Source review

    Design drawings, PDFs and markups checked for gaps.

  2. 02

    Standards set-up

    Client template, layers and title blocks loaded.

  3. 03

    Drafting

    Plans, sections, elevations and details drawn to scale.

  4. 04

    Coordination

    Consultant information cross-checked on every sheet.

  5. 05

    QA check

    Independent review of dimensions, notes and references.

  6. 06

    Issue

    Drawing sets issued with a drawing register.

Our solution

Drawings that held the programme

The permit set was prioritised and issued first, with construction details following while the permit was under review.

  • 0 wksTo permit submission
  • 0Sheets issued
  • 0Resubmission round
  • Permit set first

    Sheets the authority needed were completed before the detail work.

  • Consultant overlays

    Structural and MEP drawings overlaid and checked on every level.

  • Comment tracker

    Each review comment logged, answered and closed.

  • Client standards

    Drawings followed the contractor’s layers and title blocks.