Skip to content
Who we serve · As-built drawings

As-built drawings for a clean handover

Record drawings and models prepared from contractor markups, surveys and scans at the end of a project, so owners and facilities teams receive accurate, organised information they can actually use.

What we deliver

Handover information owners can use

At the end of a project, record drawings are often rushed, incomplete or both. The owner then spends years working from drawings that don't quite match the building.

We collect markups, surveys, scans and photos, update the drawings and models to the built condition, and organise everything the way your client or FM team wants to receive it. Better still, we can start collecting records during construction so handover isn't a last-minute scramble.

Contractors use us to meet handover obligations; owners use us to bring old records up to date after years of alterations.

What we need from you

  • Contractor markups
  • Construction drawings or models
  • Survey or scan data
  • Site photos
  • Client handover requirements
  • Handover date
  • Record plans

    Floor and roof plans as built.

  • Record sections

    Sections and elevations with true levels.

  • Services records

    MEP routes and equipment as installed.

  • As-built models

    BIM models updated for FM.

  • Asset data

    Key equipment data where required.

  • Source notes

    Where each change came from.

  • O&M packs

    Drawings organised for handover manuals.

  • Phased handovers

    Records for sections handed over early.

What's included

A typical handover package

A typical scope for this kind of project. Your quotation confirms the details.

ItemWhat you getFormat
Record plansEvery level as builtCAD · sheets
Services recordsRoutes and equipment as installedCAD · sheets
As-built modelUpdated BIM modelNative · open BIM
Asset dataKey equipment parametersAsset data schedule
O&M packOrganised to your client's structureSheets
How a project runs

Support through completion and handover

Records are organised and labelled clearly, so facilities teams can find the right drawing years after the project team has moved on.

Every project starts with a written quotation, a named point of contact and a firm delivery date, and you can begin with a small trial task.

  1. Day 1

    During construction

    Markups collected as work happens.

  2. Week 1

    Pre-completion

    Drawings updated by area.

  3. Weeks 2–4

    Survey checks

    Key areas verified from scans.

  4. Review

    Draft records

    Sets reviewed by your team.

  5. Issue

    Final records

    Drawings and models finalised.

  6. Handover

    Handover

    O&M packs organised.

Case studies

Related case studies

Selected Cadbricks projects across different services, project types and markets — see how our team supports real-world AEC requirements.

Multi-storey residential apartment tower
  • MEP BIM coordination
  • Residential

Multi-family apartment block

Project-specific BIM modeling and coordination support for a multi-family residential development.

View case study
Student accommodation building
  • Scan to BIM
  • Education

Student union hostel

Point cloud survey converted into an as-built BIM model and measured drawing set for refurbishment planning.

View case study
Annual meet 2026
  • Construction documentation
  • Education

St. College academic hall

Coordinated construction documentation set developed from design intent through to issue for construction.

View case study
Marketing images
  • Architectural BIM
  • Cultural

Museum extension

Detailed architectural model and sheet set produced for a gallery extension alongside an existing building.

View case study
Industry expo
  • CAD drafting
  • Civic

Fire station building

Permit and construction drawings for a new fire station, coordinated with structural and MEP consultants.

View case study
Exterior renders
  • Visualization
  • Commercial

Office interior fit-out

Photorealistic interior renderings used to secure client approval ahead of an office fit-out.

View case study
Our promise

Contractors use us to meet handover obligations; owners use us to bring old records up to date after years of alterations.

Why Cadbricks

What you can count on

Four things every project gets, whatever its size.

  • Your standards first

    Templates, title blocks, families and naming are set up before any work starts.

  • Independent QA

    A separate reviewer checks every set against your brief and markups before delivery.

  • Overlapping hours

    Shifts overlap US and UK working hours for calls, reviews and quick turnarounds.

  • Confidential by default

    NDAs on request, controlled access and secure transfer for every project file.

FAQs

As-built drawings questions

Quick answers about inputs, BIM records, O&M packs and timelines for as-built drawings at handover.

Still have a question?

Our team replies within one working day.

Ask our team

Contractor markups and the construction issue set, plus any surveys, scans or photos that record changes.

Yes, so the model matches the drawings and the building.

Yes. Key equipment data and parameters can be added for FM.

Yes, and it makes handover faster and more accurate.

We list each conflict and agree it with your team before finalising.

Yes, as well as for contractors and architects.

It depends on size and how complete the markups are. We plan around your handover date.

Files are shared only with the people working on your project, through secure transfer or your own platform. We sign NDAs on request and never reuse your drawings, models or data on other work.

Use whatever suits you: email, a file-sharing link or your own common data environment. Within a working day of receiving the package, we send a short list of questions so nothing is left to guesswork.

Relevant industries

Handovers for every building type

As-built records for offices, hospitals, schools, hotels, residential blocks and infrastructure buildings.

Handover approaching?

Send the scope and markups. We'll reply with a quotation and a firm delivery date within one working day.