Skip to content
BIM services

MEP BIM that fits the ceiling void

Ducts, pipes, trays and sprinkler mains all want the same few hundred millimetres of ceiling void. We model your services in BIM, route them properly and coordinate them with the structure, so the fight happens on screen and not on site.

  • Qualified architects & engineers
  • Your templates & standards
  • Fast, reliable turnaround
  • Flexible engagement models
Building services installation on a construction site
LOD 300–400Design to installation
Native · coordination · CADDelivered in your formats
Overview

Services coordinated before they reach site

Ask any site manager where the rework comes from and they'll point up at the ceiling. Services are designed in plan, installed in three dimensions, and the gap between the two is where time and money disappear.

We close that gap. Starting from your design drawings and schematics, we model the main routes first, check them against beams, ceilings and risers, then fill in branches, terminals and equipment. Where something won't fit, we flag it with a clear view and a suggested fix.

You get a coordinated model, combined services drawings and builder's work information that installers can trust. If the project moves into fabrication, the same model can be developed to LOD 400 without starting again.

We work from

  • MEP design drawings and schematics
  • Equipment schedules and data sheets
  • Architectural and structural models
  • BIM template and MEP families
  • Ceiling and service zone heights
  • Target LOD and deadline
  • HVAC systems

    Ductwork, diffusers, AHUs and plant modeled to size and connected.

  • Plumbing & drainage

    Domestic water, drainage and vents routed with correct falls.

  • Electrical systems

    Cable trays, containment, lighting and power layouts in 3D.

  • Fire protection

    Sprinkler mains, branches and heads coordinated with ceilings.

  • Clash-free routing

    Services coordinated with structure and each other before issue.

  • Coordinated drawings

    Combined services layouts and sections for installers.

  • Equipment schedules

    Model-driven schedules and quantities for procurement.

  • Plant room detail

    Plant rooms and risers modeled at a higher level of detail.

Level of detailing

From concept to as-built

We model at the level of development your project needs. Pick a level to see what it includes.

28.0 m 20.0 m W-01W-02W-03 AS-BUILT ✓ LOD 300 · Precise geometry
LOD 300

Precise geometry

Elements modeled to exact dimensions, positions and quantities, ready for documentation.

  • Exact wall types and thicknesses
  • Specific doors, windows and stairs
  • Accurate levels, grids and rooms

Typical useDesign development, permit and construction sets

Why choose us

MEP models built by services engineers

Our MEP team is made up of mechanical, electrical and plumbing engineers. They think about access panels, insulation and maintenance space, not just whether two objects overlap. Every project starts with a written quotation, a named point of contact and a firm delivery date, and you can begin with a small trial task.

  • 0+Projects delivered
  • 0%Client retention
  • 0+In-house experts
  • Your standards first

    We work inside your templates, title blocks, families and naming, so files drop straight into your workflow.

  • Qualified AEC team

    Architects and engineers who know how drawings and models are used on real projects.

  • QA on every delivery

    A separate reviewer checks accuracy, completeness and sheets against the brief before files leave us.

  • Work in your time zone

    Shifts overlap US and UK working hours for calls, reviews and quick turnarounds.

  • Confidential by default

    NDAs on request, controlled access and secure file transfer for every project.

  • Scales with your workload

    Add capacity for a deadline and scale back when it passes, without hiring.

Deliverables

What you receive

MEP models come with the drawings and exports installers and coordinators rely on.

DeliverableFormatWhat it includes
MEP modelNative · open BIMHVAC, plumbing, drainage, electrical and fire protection systems
Coordinated layoutsSheets · CADCombined services plans and sections
Builder's work drawingsSheets · CADPenetrations and openings for the main contractor
Equipment schedulesIn model · spreadsheetPlant, terminals and fixtures with key data
Clash exportCoordination modelFiles ready for coordination meetings
Our process

From schematics to model in six steps

A coordinated workflow that resolves services conflicts before installation starts.

  1. 01

    Share your inputs

    Design drawings, schedules and base models.

  2. 02

    Scope & quote

    Systems, LOD and outputs agreed in writing.

  3. 03

    Zones & set-up

    Service zones, levels and systems configured.

  4. 04

    Modeling

    Main routes first, then branches and terminals.

  5. 05

    Clash resolution

    Conflicts resolved with structure and trades.

  6. 06

    Drawings & delivery

    Coordinated layouts, sections and model issued.

Have MEP drawings ready? Send the design set and base models. You'll have an approach and a quote within one working day.

FAQs

MEP BIM questions

Quick answers about systems, LOD, coordination and deliverables for MEP BIM.

Still have a question?

Our team replies within one working day.

Ask our team

HVAC, plumbing and drainage, electrical containment and lighting, fire protection, and specialist systems such as medical gases when the project needs them.

We model to the sizes in your design. If a size is missing or looks wrong, we flag it and agree it with your engineer instead of guessing.

We link the architectural and structural models, run clash tests and resolve conflicts before drawings are issued. Anything that needs a design decision goes back to you with a clear view.

LOD 300 for design coordination, LOD 350 when installers will work from the model, and LOD 400 for fabrication and spooling.

Yes. Penetration and opening drawings come straight from the coordinated model, so the main contractor knows exactly where to form holes.

Yes. We work with your families and build any missing equipment to your parameter standards.

A typical floor of an office or hospital takes a few days to a week, depending on the systems involved. Your quotation includes a firm schedule.